Method for a Drainage Roadway Location Determination for an Overlying Methane Drainage System
Abstract
The paper analyses possibilities to carry out methane drainage of a longwall in seam 510. A possibility to fight against the methane hazard was determined based on results of forecasting for methane emission to mine workings. A system of methane drainage was suggested for the adopted method of longwall face ventilation. The location of drainage roadway was determined for the selected methane drainage system. The paper includes a geomechanical analysis for a numerical model, which was aimed at determination of the optimum location of the drainage roadway in a seam overlying the longwall panel.
Copyright (c) 2020 Test
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
This journal permits and encourages authors to post items submitted to the journal on personal websites or institutional repositories both prior to and after publication, while providing bibliographic details that credit, if applicable, its publication in this journal.