Design of Pre Blasting (Pre-Splitting) in Tan Cang Quarry NO.1 in Vietnam
Abstract
Nowadays, construction material quarries in Dong Nai Province are exploiting with large quarrying depth, and the annual output could reach to tens of million cubic meters. The blasting frequency could be reached to hundreds of times, so the frequency is the major reason decreasing the cohesion of rock mass. Therefore, the surrounding area of blasting holes is broken, especially the area next to the final border where bench slope angle is not implemented as that of design stage, as well as the back break, also causes fractures on the bench slope, resulting in instability and unsafety due to falling rock. In this paper, the author also wants to introduce the pre blasting and the method to define blasting parameters to increase the stabilization of Slopes in Tan Cang quarry NO.1 in Vietnam.
Copyright (c) 2020 Test
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
This journal permits and encourages authors to post items submitted to the journal on personal websites or institutional repositories both prior to and after publication, while providing bibliographic details that credit, if applicable, its publication in this journal.